China Gold Supplier for Ceiling Tee Bar - Lay-In Fine Fissured Ceiling Suspended System White Ceiling Grid – Beihua
China Gold Supplier for Ceiling Tee Bar - Lay-In Fine Fissured Ceiling Suspended System White Ceiling Grid – Beihua Detail:
Flat ceiling grid
The decorative surface is made of matte coated steel strip, with fine texture and no color difference.
Multi-roller molding, smooth surface; high strength, easy and quick installation.
Narrow flat ceiling grid
Simple and elegant shape, excellent shock resistance. Light weight, easy and quick installation.
Groove-type ceiling grid
Groove shape is available in black and white, with strong three-dimensional effect.
Easy installation, firm system.
Exposed ceiling grid
Using double-sided color coated steel strip as raw material, soft color, clear lines, strong three-dimensional effect has high dimensional accuracy and close coordination. It can be used with metal ceilings and mineral wool sound-absorbing panels. It is a classic product for indoor ceilings in modern buildings.
Description |
Length |
Height |
Width |
|
Flat T24 Ceiling Grid Main Tee |
3600mm/3660mm |
32mm |
24mm |
|
Flat T24 Ceiling Grid Long Cross Tee |
1200mm/1220mm |
26mm |
24mm |
|
Flat T24 Ceiling Grid Short Cross Tee |
600mm/610mm |
26mm |
24mm |
|
Wall Angle |
3000mm |
22mm |
22mm |
1. During structural construction, the joints of the cast-in-place concrete floor or precast concrete floor should be pre-embedded with φ6~φ10 reinforced concrete suspenders according to the requirements of the shot meter. When the shot meter is not required, the steel bar hanger shall be embedded according to the arrangement position of the large keel rod, the general spacing is 900~1200mm.
2. When the wall pillars of the suspended ceiling room are brickwork, they should be pre-embedded with anticorrosive wood bricks at the elevation of the ceiling along the walls and pillars. The distance between the walls is 900~1200mm, and each side of the pillars should be buried. More than two wooden bricks.
3. After installing the various pipelines and ventilation channels in the ceiling, determine the position of the light, the ventilation opening and various openings.
4. All kinds of materials are complete.
5. The wall and ground wet work projects should be completed before the ceiling cover panel is installed.
6. Set up the shelf of the ceiling construction operation platform.
7. Before the large-area construction of the lacquered skeleton ceiling, a sample room should be made. The curvature of the ceiling, the structure treatment of the light trough, the vent, the division and the fixing method, etc. should be tested and installed and approved before the large area construction.
Product detail pictures:
Related Product Guide:
We believe that prolonged expression partnership is really a result of top of the range, value added support, rich encounter and personal contact for China Gold Supplier for Ceiling Tee Bar - Lay-In Fine Fissured Ceiling Suspended System White Ceiling Grid – Beihua , The product will supply to all over the world, such as: Montreal, Qatar, belarus, Our qualified engineering team will usually be prepared to serve you for consultation and feedback. We've been able to also deliver you with absolutely free samples to meet your needs. Best efforts might be made to offer you the ideal service and items. For anyone who is interested in our company and products, be sure to make contact with us by sending us emails or contact us right away. In order to know our solutions and organization. ar more, you can come to our factory to determine it. We are about to usually welcome guests from around the globe to our corporation. o create small business relations with us. Please genuinely feel no cost to speak to us for enterprise. nd we believe we have been gonna share the most effective trading practical experience with all our merchants.
By Margaret from Armenia - 2018.12.11 11:26
Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
By Prima from Philippines - 2018.12.10 19:03